September 24, 2025

The North York project
The North York project uses EBS Global's lightweight steel systems. Prefabrication moves much of the framing work off site and can reduce material waste.
Lightweight components are easier to transport and handle on site. The framing is engineered for the loads the building needs to carry.
Alongside the steel systems, EBS Global provides engineering support and help with assembly on site.
We work from our headquarters in Barrie, Ontario, on projects in Canada and abroad.
On site in North York


From EBS Global’s North York project video and site stories.
Talk to our team (647) 812-0253
Send drawings or a short description and we will prepare a quote.



