September 24, 2025
EBS Global opens its Barrie plant
Event film from the March 20, 2025 opening, EBS Global.
On March 20, 2025, EBS Global opened its cold-formed steel facility at 220 John Street in Barrie, Ontario. Ontario Cabinet Ministers Michael Tibollo and Andrea Khanjin, Barrie Mayor Alex Nuttall, and MPs John Brassard and Doug Shipley attended the ribbon-cutting, along with architects, contractors and other industry professionals.
Engineering and manufacturing take place in the same building, from the first drawing to the finished panel. Cold-formed steel is non-combustible and recyclable. Panels are assembled in the plant and arrive on site ready to set, reducing the framing work needed there. The opening also brings skilled manufacturing jobs to Barrie.
Rolled in-house in Barrie
Cold-formed steel profiles are formed on our own line, then engineered into panels, frames and roofs. Every member is dimensioned and cut for its place in the assembly, which keeps profiles consistent and the frame square. We design and manufacture to CSA S136-20 for cold-formed steel and to the National Building Code of Canada 2020.
Opening day


Photographs from EBS Global’s grand-opening post.
Talk to our team (647) 812-0253
Send drawings or a short description and we will prepare a quote.



