Aerial view of the Niagara project: cold-formed steel framing with floor joists in place

The Niagara project

On the Niagara project, engineering, manufacturing, logistics and on-site assembly are coordinated as one sequence, which keeps the work moving.

Our cold-formed steel systems shorten the construction schedule while keeping the structural strength and durability the project needs. Components are manufactured to the millimetre and designed for efficient assembly, so our teams make faster progress with more control on site.

Site footage from the Niagara build.

Engineered before it reaches site

Every component for the Niagara project is developed through detailed engineering and produced to the millimetre. Individual elements then come together efficiently on site, and the structure stays consistent throughout.

Cold-formed steel lets us combine accuracy, strength and efficiency in one building system. Digital design, engineering, manufacturing and final assembly are all coordinated toward the same result: a structure that performs as designed.

On site, 31 August 2026

Cold-formed steel, controlled production and efficient assembly keep the Niagara project moving quickly and accurately.

EBS cold-formed steel systems